Back to main

Disney GC3 Phase 2A Grand Central Creative Campus

Location:

Glendale, CA

Client:

Disney CORE Services

Architect:

Bohlin Cywinski Jackson

Office:

LA

Project size:

338,000 sqft

Date Completed:

2012

Disney GC3 Phase 2A includes two buildings and one parking structure. The six-story North building has approximately 237,000sqft of office space. The South building has one below-grade level and five above grade levels, totaling approximately 94,000sqft. It also houses the central plant, grade-level cafeteria and offices above grade. The Phase 2A parking structure has six above-grade and one below-grade levels with a total of 1260 stalls.

This project has achieved a LEED Platinum certification.